We are currently experiencing issues with email delivery; this is being resolved as quickly as possible.

stationeers.de Mod workshop · Dominik1199
DE Sign in
  1. Home
  2. News
  3. Nuclear Power Plant 1.0.2, Power Regulator 1.0.1, Fire Alarm System 0.5.1 and Air Conditioning 1.1.1

Nuclear Power Plant 1.0.2, Power Regulator 1.0.1, Fire Alarm System 0.5.1 and Air Conditioning 1.1.1

The fuel rod factory accepts steel ingots, the turbine tells you why it shut down, and wall devices no longer vanish into finished walls.

  • Nuclear Power Plant 1.0.2: the fuel rod factory ejected steel ingots as foreign items – fixed. A turbine trip now shows its cause (condenser too hot, no cooling water, manual) on turbine, reactor and control room. If you acknowledge too early, the restart is queued: the turbine starts again by itself as soon as the condenser has cooled down.
  • Wall devices in front of finished walls: a finished wall is 15 cm thick and can sit on the device side. The Power Regulator 1.0.1, the radiation monitor and radiation detector of the nuclear power plant and the alarm sounder and manual call point of the Fire Alarm System 0.5.1 now stick out far enough and stay visible.
  • Connections: the cable inlets of the Power Regulator and the refrigerant pipe on the indoor unit of Air Conditioning 1.1.1 sit exactly where cable and pipe dock.

Thanks to the players who reported this.

Esc
↑ ↓ selectEnter open/ opens search anywhere