Substation
Transformers from 10 kW to 1 GW with losses, temperature and protection, grid stabiliser, switchgear with a live network diagram and distribution boxes with load shedding.
We are currently experiencing issues with email delivery; this is being resolved as quickly as possible.
Power
Power cable without a limit: overload never burns it out. All 11 shapes with a custom model.

Game cables burn out at 5 kW, 100 kW or 500 kW. Power Cable+ has no limit: overload never burns it out, the same principle as the cable terminals of the game's power pylons. It comes in all 11 shapes of the super heavy cable, each with its own 3D model: glossy dark blue jacket with four glowing cyan stripes, chrome collars and chrome clamps, junction boxes with glowing dots. On top of that it has its own wreck and its own cable coil.
Building
In the network
No settings, no console commands, no IC10. The Fluix Line also comes in a variant without a power limit, bundled with a gas pipe and a water line. The server and all players need the mod.
Full guide: Power Cable+ in the wiki
First release: Power Cable+ without a power limit in all 11 shapes with custom models, wrecks and coil, tooltip with network load and a warning about weaker parts.
Never from overload; only a welding torch destroys it. The network can still burn out: if there is a game cable, an Extreme Cable or a fuse in it, that part burns out at its own limit. A network is only unlimited if it consists entirely of Power Cable+. Looking at a power cable+ shows the weakest part in orange.
Yes, end to end it connects to every cable into one network. Only one kind of cable fits in one cell, though, so Power Cable+ and game cables cannot be merged. The connected game cable then limits the whole network. To supply consumers on thin cables, separate them into a network of their own with a transformer. More in the guide.
Transformers from 10 kW to 1 GW with losses, temperature and protection, grid stabiliser, switchgear with a live network diagram and distribution boxes with load shedding.
Reactor, steam turbine and cooling tower for about 1 MW of power, plus a large reactor and a 1.5 MW turbine – with radiation, a radiation shield gate, meltdown and nuclear waste.
Gas pipe, liquid pipe and power cable in one bundle: one line instead of three, up to 500 kW or unlimited.