What you learn today
- Cable capacity
- Avoid burnt cables
- Distribute load
A bang, smoke, and half the base is dark: a piece of cable has burnt out. That does not happen by chance but by a clear rule – and a chip can watch it.
What a cable carries
| Part | carries at most |
|---|---|
| Cable (normal) | 5,000 W |
| Cable (heavy) | 100,000 W |
| Cable (super heavy) | 500,000 W |
| Fuses | 1 kW, 5 kW, 50 kW, 100 kW, 500 kW |
When it burns
Every tick the game compares the flow of a network with every cable and every fuse in it. The flow is the smaller of generation and demand. If it is above the limit of a part, one part breaks – the weakest link decides, and at most one breaks per tick, chosen at random. A fuse that trips destroys its piece of cable along with it.
Two consequences you need to know:
- A single piece of normal cable in a heavy line limits the whole line to 5,000 W.
- Battery to battery without a transformer burns: a game battery asks for its whole free capacity and offers its whole content. That quickly makes the flow larger than any normal cable.
Measuring the load
The cable analyzer reads what is flowing right now with PowerActual. Divided by the cable limit that gives the utilisation:
lbn load METER HASH("Hauptleitung") PowerActual Average
div share load CABLE
A traffic light makes the situation clear at a glance: green up to 80 %, yellow above, red from 95 %.
Distributing the load
Before it burns, the chip takes a consumer off the network. That is load shedding, this time not because of the battery but because of the cable. With hysteresis, so nothing flutters:
slt tmp share SHED
and on on tmp
slt tmp share BACK
or on on tmp
In the long run this is only an emergency fix. The right solution is to spread the load over two lines, lay heavy cable or put a transformer in between whose Setting stays below the cable limit.
If the analyzer fails, you do not know how much is flowing. Then “red and shed” is the safe direction – better the workshop dark for a moment than a cable fire.
Diagram
Exercise
Task
The cable analyzer “Hauptleitung” sits on a normal cable (5000 W). Show the utilisation in percent on “Kabellast” and colour the display: green below 80 %, yellow up to 95 %, red from 95 %. The wall heater “Werkstatt” switches off from 90 % and only comes back below 70 %. If the analyzer is missing: display −1, red, heater off.
Hints
Hint 1
Percent: mul tmp share 100, −1 when the reading is missing.
Hint 2
Colour in two stages: first green or yellow with slt, then switch to red with sge and RED.
Hint 3
Shedding as in load shedding: and with SHED, or with BACK, finally and with ok.
Quiz
5 questions. You pass from 60 % – the server does the grading.
Complete the day
- Passed the simulator exercise
- Passed the quiz with at least 60 %