Day 207 of 365 · Pro · Month 7: Power and energy

Multiple grids

Measure two power grids separately, pass power over a transformer on purpose and switch into island mode with a lever.

Lesson 20 min Week 30

What you learn today

  • Measure grids separately
  • Control the transfer
  • Island mode

The base has grown: the solar fields stand in the north, workshop and habitat lie in the south. Two grids, two battery banks. If the north has a surplus and the south is in need, power should go across – but only then.

Measuring grids separately

A cable network is a power and data network at the same time. A chip on the southern network sees nothing on the northern one. The solution is devices with a separate data port:

DeviceConnections
Station batterypower in, power out, separate data port
Transformer (large)power in, power out, separate data port

Lay a separate control network: a cable that only connects the data ports of the batteries of both grids, the large transformer and the chip housing. Hardly any power flows over this network, but the chip sees both battery banks by their names:

lbn north BATT HASH("AkkuNord") Ratio Average
lbn south BATT HASH("AkkuSued") Ratio Average

Important: the control network must never touch a power cable of either grid. Otherwise the grids would be connected and the whole separation gone.

Controlling the transfer

The transformer “Kopplung” hangs with its input on the northern grid and with its output on the southern grid. Power flows only in this direction. Setting limits the transfer, On switches it:

  • If the south drops below 30 %, the help starts.
  • Only from 70 % in the south does it end again – a hysteresis.
  • The north only gives while it is itself above 40 %. Otherwise both grids would end up empty.
sgt tmp north NORTH_MIN
and help help tmp

Island mode

Island mode means: every grid supplies itself, the transformer is off. That is the safe state during maintenance, during a short circuit in the south – and when a reading is missing. A lever “Insel” forces it by hand.

Tip

If a battery bank is missing, Average returns NaN. Every comparison with NaN is 0, so the help switches off by itself. Whoever does not know how the other grid is doing switches the coupling off.

Diagram

Devices on the data network with type and name IC housing IC10 StructureGasSensor „Lager“ StructureGasSensor „Werkstatt“ StructureWallHeater „Lagerheizung“ StructureWallHeater „Lagerheizung“ StructureWallHeater „Werkstattheizung“ lbn SENSOR HASH("Lager") reads only this sensor sbn HEATER HASH("Lagerheizung") switches both at once
A separate control network connects only the data ports. The power grids stay separate, yet the chip sees both sides.

Exercise

Task

The large transformer “Kopplung” passes power from the northern to the southern grid. It runs with Setting 3000 when the south (“AkkuSued”) drops below 30 % and stays on until the south reaches 70 %. The north (“AkkuNord”) only gives while it is above 40 %. If the lever “Insel” is thrown, the coupling stays off. If a battery bank is missing: coupling off.

Hints

Hint 1

Hysteresis as with the heater: first and with “below SOUTH_OFF”, then or with “below SOUTH_ON”.

Hint 2

Then two locks with and: north above NORTH_MIN and lever not thrown.

Hint 3

Finally write the transformer's Setting and On.

Quiz

4 questions. You pass from 60 % – the server does the grading.

Complete the day

  • Passed the simulator exercise
  • Passed the quiz with at least 60 %

Without an account progress is saved in this browser only.

Report a mistake in this lesson

Please sign in to report. Sign in

Esc
↑ ↓ selectEnter open/ opens search anywhere