What you learn today
- Control the ice crusher
- Water in tanks
- Prevent freezing
On Mars water is ice. An ice crusher turns it into something drinkable – and a pipe outside turns it back into ice on a cold night. The chip takes care of both.
The ice crusher
StructureIceCrusher takes in ice via the chute and melts it. What is released goes out separately:
- gases into the gas output
- liquids like water into the liquid output
Setting is a temperature here: the crusher warms the melt to this value before it outputs it. If its content is colder than Setting, it heats with 1,000 J per tick; output only happens once the content is warmer than Setting − 1 K. It cannot cool. On the dial you set 120 to 320 K, the default is 288.15 K. With On you switch it, Activate it sets itself as soon as ice has been drawn in. Its inside withstands up to 1,200 atmospheres; once it is that full, it draws in no more ice.
According to the game data, water ice delivers 20 mol of water and 5 mol of nitrogen per piece – the nitrogen ends up in the gas output.
Water in tanks
The small liquid tank holds 6,000 litres. It has no logic of its own any more, so a liquid pipe analyzer (StructureLiquidPipeAnalyzer) sits on its line. Its VolumeOfLiquid tells how many litres of liquid are in the network. The crusher runs until the tank is almost full and only starts again clearly below that – a hysteresis:
slt tmp litres FULL
and crush crush tmp
slt tmp litres REFILL
or crush crush tmp
Preventing freezing
Water freezes at 273.15 K, polluted water already at 276.15 K. Mars nights are around 220 K. A tank or a pipe outside cools down, and frozen water no longer flows. A pipe heater for liquid (StructureLiquidPipeHeater) on the line keeps it warm. According to its device data it puts 1,000 J per tick into the pipe.
The second hysteresis: heat below 5 °C, stop above 15 °C.
The best frost protection is none: insulated tanks and pipes, or everything inside the heated base. The chip is the safeguard for the places where it cannot be done otherwise.
If the analyzer is missing, both readings are NaN. Crusher and heater switch off – pumping water blindly into a tank the chip cannot see would be worse than a break.
Diagram
Exercise
Task
The ice crusher “Eisbrecher” runs with Setting 293.15 K until the analyzer “Wasser” on the tank line reports 5000 litres, and only starts again below 4000 litres. The pipe heater “Wasserheizung” heats below 278.15 K and stops above 288.15 K. If the analyzer is missing: both off.
Hints
Hint 1
Crusher: slt/and with FULL, then slt/or with REFILL.
Hint 2
The target temperature goes into the crusher's Setting.
Hint 3
Heater the same way with WARM_OFF and WARM_ON.
Quiz
4 questions. You pass from 60 % – the server does the grading.
Complete the day
- Passed the simulator exercise
- Passed the quiz with at least 60 %
Without an account progress is saved in this browser only.
Report a mistake in this lesson
Please sign in to report. Sign in