Substation – Guide

Transformers from 10 kW to 1 GW, grid stabiliser, switch bays on a busbar, control desk with a network diagram and distribution boards with load shedding. Setup, operation, IC10, console and settings.

Last changed: Oct 13, 2026

v1.0.0 Substation

The Substation brings power engineering for large stations: a transformer series from 10 kW to 1 GW with losses, temperature, fans and protection, a grid stabiliser with a capacitor bank, switchgear made of incoming and outgoing bays on a busbar of its own, a control desk with a live network diagram and four distribution boards from the switch box to the main distribution cabinet. Every device has its own model. All model labels, displays, buttons and device names appear in German or English, depending on the game language.

Overview

DevicePowerSizePurpose
Small Transformer10 kWwall, 1 × 1 mseparate a small network
Medium Transformer100 kW1 × 1 m, 1.2 m highlocal network
Large Transformer500 kW2 × 1.5 m, 2.1 m high, 4 fansplant and base network
Power Transformer10 MW3 × 2 m, 3.1 m high, 8 fanspower plants
Generator Transformer100 MW4 × 3 m, 4.2 m high, 5 fansbetween power plant and grid
Grid Coupling Transformer1 GW5 × 4 m, 5.2 m high, 12 fanscouples GW grids
Grid Stabiliser250 kW, 10 MJcabinet 1 × 0.5 m, 2.2 m highevens out wind and solar power, bridges dips
Incoming Bay, Outgoing Bay–1 × 2 m, 2 m highswitchgear on the busbar
Control Desk50 W own usedesk 1.5 × 1 m with monitornetwork diagram, remote control, E-STOP
Switch Box–wall, 1 × 0.5 m1 input → 4 outputs with switches
Small Distribution Board–wall, 1 × 1 m1 → 4 with miniature circuit breakers
Sub-Distribution Board–wall, 2 × 1 m2 → 8, mains and reserve
Main Distribution Board–free-standing cabinet 3 × 1 m, 1.75 m high4 → 12, priorities, load shedding
Busbarunlimited11 shapes, like a cablebackbone of the switchgear
Substation Fence, Line Gantry, High Voltage Sign––decoration

The rated power of every transformer type can be changed in the LaunchPad, up to 10 GW. All devices are non-flammable.

Requirements

  • Stationeers 0.2.6428, BepInEx 5.4.23.5, StationeersLaunchPad 1.0, see Installation
  • Mod in the active mod pack
  • In multiplayer: the server and all players

Building and recipes

KitMachineCost
Kit (Small Transformer)Electronics printer, tier 110 iron, 12 copper, 2 gold, 2 silicon
Kit (Medium Transformer)Electronics printer, tier 110 steel, 30 copper, 10 iron, 5 electrum
Kit (Large Transformer)Electronics printer, tier 240 steel, 80 copper, 20 iron, 15 electrum, 10 silicon
Kit (Power Transformer)Electronics printer, tier 2120 steel, 200 copper, 60 iron, 40 electrum, 20 invar, 30 silicon
Kit (Generator Transformer)Electronics printer, tier 2200 steel, 300 copper, 60 iron, 60 electrum, 40 invar, 20 inconel, 40 silicon
Kit (Grid Coupling Transformer)Electronics printer, tier 2500 steel, 800 copper, 150 iron, 150 electrum, 100 invar, 50 inconel, 25 hastelloy, 10 waspaloy, 80 silicon
Kit (Grid Stabiliser)Electronics printer, tier 220 steel, 30 copper, 20 gold, 30 silicon, 15 electrum, 10 solder
Kit (Switch Bay)Electronics printer, tier 230 steel, 20 copper, 20 silicon, 8 electrum, 4 invar
Kit (Control Desk)Electronics printer, tier 110 iron, 10 gold, 15 silicon, 10 copper, 5 solder
Busbar BundleElectronics printer, tier 23 copper, 1 electrum, 1 constantan, 0.5 inconel, 0.5 hastelloy
Kit (Switch Box)Electronics printer, tier 14 iron, 6 copper, 1 silicon
Kit (Small Distribution Board)Electronics printer, tier 18 iron, 12 copper, 2 gold, 3 silicon
Kit (Sub-Distribution Board)Electronics printer, tier 212 steel, 24 copper, 4 gold, 6 silicon, 4 electrum
Kit (Main Distribution Board)Electronics printer, tier 240 steel, 60 copper, 10 gold, 12 silicon, 10 electrum, 4 invar
Kit (Substation Fence)Autolathe2 iron, 1 steel
Kit (Substation Accessories)Autolathe5 steel, 5 iron, 2 silicon

With the Kit (Switch Bay) the mouse wheel picks incoming or outgoing bay, with the accessories kit line gantry or warning sign. The busbar bundle is a coil like a cable and also fits the cable gun and the electrician's belt. The costs are in GameData/umspannwerk.xml in the mod folder.

Cable protection and full power

Every powered device follows the same rule as the Power Regulator:

  • No connection ever carries more than 95 % of the weakest cable or fuse in its network. Other generators and consumers in that network count too. So no cable burns out.
  • From networks with their own consumers a device only takes the surplus, so nothing there switches off.
  • A device only hands out what is in its buffer. No energy comes from nothing, not even at 1 GW next to 50 W consumers.
Weakest part in the networkOne connection carries at most
Cable4.75 kW
Heavy cable95 kW
Super heavy cable475 kW
Extreme Cable9.5 MW
Busbar, Power Cable+, Fluix Line Unlimitedno limit

So the generator and grid coupling transformers only reach full power on unlimited conductors. If a connected cable is weaker than the rated power, the display shows the cable limit in orange, and looking at the device says so too.

Data bridge

With the DATA button the devices of all connected networks are visible to IC10 and logic across the network border, also together with the Power Regulator. Power stays separate. The data bridge is on for newly built devices and can be switched off per device (button, IC10, console) or completely in the config. The switch box has no DATA button, there IC10 or uw bruecke switches it.

Transformers

Generators go to PRIMARY (power and data, input), consumers to SECONDARY (power, output). Arrows on the device show the direction. On the small transformer PRIMARY sits top left (cable from above), SECONDARY bottom right. All other transformers stand on the floor: PRIMARY left, SECONDARY right, both at floor level. The display is at eye level.

TransformerCoolingHeating timeSpecial
Small Transformernatural air coolingabout 5 minwall device on a mounting frame
Medium Transformernatural oil coolingabout 8 minsloped control panel at the front
Large Transformerfans, 2 stagesabout 12 min4 fans
Power Transformerfans, 2 stagesabout 20 min8 fans on two radiator banks
Generator Transformerfans, 2 stagesabout 30 minhalf the losses, enclosed phase busducts
Grid Coupling Transformerfans, 2 stagesabout 40 min35 % of the losses, fire wall, 12 fans

Mode

ModeDirection
FORWARDPRIMARY → SECONDARY (default)
REVERSESECONDARY → PRIMARY, for example to feed solar power back
OFFno power

Losses and temperature

  • Losses: 1 per mille of the rated power at no load plus 0.8 % at rated load, with the square of the load. The generator transformer has half of that, the grid coupling transformer 35 %. Without power there are no losses.
  • The losses turn into heat. At most 10 kW per transformer goes into the air at the device, the rest radiates away.
  • Overload: up to 150 % of the rated power. Above 100 % the transformer slowly heats up.
  • Fans (large, power, generator and grid coupling transformer): AUTO switches stage 1 from 60 °C and stage 2 from 75 °C. Each stage uses 0.05 % of the rated power.
  • From 105 °C the transformer throttles its power instead of tripping. At 130 °C the protection trips. A reset is only possible below 90 °C.
  • Hot climates (up to 50 °C ambient, for example Venus and Vulcan) and vacuum lower the continuous rating. In vacuum 40 % of the natural cooling remains, and the fans do nothing.

Protection

The transformer trips on over-temperature, on a short circuit (PRIMARY and SECONDARY on the same network) and by hand or IC10. When tripped nothing flows, the FAULT LED flashes red. ACK resets it.

Operation

ControlEffect
Rotary switchmain switch
MODEFORWARD → REVERSE → OFF
FANSAUTO → off → stage 1 → stage 2 (transformers with fans only)
LIMIT - and +manual limit, with Alt in fine steps; above the cable limit = none
PAGE < >change the display page
DATAdata bridge on or off
ACKreset a trip

The display has five pages: POWER, TEMPERATURE, NETWORKS, PROTECTION, DATA BRIDGE. A dial thermometer (0 to 150 °C) and a load gauge (0 to 150 %) on the tank show the values as well.

LEDMeaning
RUNtransformer working
FAULTflashes red after a trip
LOADgreen, orange above 80 %, red blinking above 100 %
TEMP.green, yellow from 60 °C, orange from 105 °C, red blinking shortly before the trip
FANSblue blinking: fan stage 1, blue: stage 2 (transformers with fans only)
DATAdata bridge

Grid Stabiliser

A cabinet with a capacitor bank: stores 10 MJ and delivers up to 250 kW (both adjustable, up to 10 GW and 1,000,000 MJ). INPUT on the left (power and data), OUTPUT on the right, both at floor level. It only charges from the surplus of the input network.

ModeEffect
FOLLOWdelivers what the output network needs and bridges dips at the input (clouds, calm, outage) from storage
CONSTANTdelivers the set point evenly, set with SET - and +; 0 = maximum power
SMOOTHdelivers the moving average of the input power over 120 s, turning jittery wind or solar power into an even flow

Loss: 1 % of the output plus 0.2 % self-discharge per minute. A 10-segment charge bar next to the display shows the level, the CHARGE (green) and DISCHARGE (orange) LEDs the direction. Buttons: SET - and +, MODE, PAGE < >, DATA, ACK and the main switch. The display has the pages STORAGE, OUTPUT, INPUT and DATA BRIDGE.

Switchgear

Busbar

A square busbar duct with copper bars for power and data, without a power limit. It is built with the busbar bundle like a cable: right-click opens the shape selection (11 shapes), the mouse wheel picks. With wire cutters in the other hand a new piece merges into the matching junction; deconstruct with wire cutters as well.

End to end the busbar connects to all cables, but only one kind of cable fits in one cell. A network burns out at its weakest part: if there is a game cable or fuse in the busbar network, its limit applies. Looking at the busbar shows limit, load and the connected bays and warns about weaker parts. A destroyed busbar (welding torch or a configured limit exceeded) conducts nothing and is removed with wire cutters.

Incoming and outgoing bay

Both bays are outdoor switch bays with busbar disconnector, circuit breaker, current transformer, line disconnector with earthing switch and a local cabinet with a mimic diagram. BUSBAR at the back (power and data), LINE at the front (power), both at floor level.

BayRoofPower flowsProtection mode (PROT. button)
Incoming BayblueLINE → busbarPRIORITY (used first) or RESERVE (only covers what the priority feeds cannot, e.g. battery or emergency power)
Outgoing Bayorangebusbar → LINELIMIT (holds the feeder at its limit) or TRIP (after 2 s of overload the breaker opens)
  • All bays on the same busbar form one plant: incoming power flows straight into the feeders, the busbar only carries the difference.
  • Power only flows with breaker ON, disconnector CLOSED and earthing OFF. New bays start with disconnector CLOSED, earthing OFF, breaker OFF.
  • Interlocking: disconnector only with breaker OFF, earthing only with the disconnector open, ON not onto an earthed bay. Disconnector and earthing switch move visibly.
  • A short circuit (LINE and busbar on the same network) trips at once. ACK resets it.
  • With AutoWiedereinschaltung a feeder switches back on once by itself after an overload trip.

Buttons on the local cabinet: illuminated buttons ON and OFF (breaker), DISCON., EARTH, PROT., LIMIT - +, PAGE < >, DATA, ACK. The display has five pages: flow, switches, protection, busbar, data bridge. LEDs: RUN, FAULT, LIMIT (at the limit) and DATA.

Control Desk

A desk with a monitor. The control desk finds every switch bay in its data network and draws them live as a network diagram: busbar, disconnectors, breakers, earthing switches, flows and connected transformers. Green means live, grey dead, orange at the limit or hot, red blinking tripped, yellow earthed.

  • Pick a bay with BAY < >, with several busbars with BUSBAR.
  • Then ON, OFF, DISCON., EARTH and ACK – like at the bay, interlocked.
  • Press E-STOP twice: every breaker opens.
  • On a trip the beacon and the ALARM LED flash and the horn sounds until ACK.
  • One connection at the back for power and data (50 W): directly to the busbar or to a network with a data bridge. A thin cable in the busbar network limits the whole plant.

Step by step

  1. Lay the busbar.
  2. Place the bays with their back (BUSBAR) on the busbar and run the LINE at the front to the power plant, transformer or consumer network.
  3. Set incoming bays to PRIORITY or RESERVE, outgoing bays to LIMIT or TRIP.
  4. Per bay: earthing OFF, disconnector CLOSED, breaker ON.
  5. Connect the control desk to the busbar or to a network with a data bridge.

Distribution boards

Every distribution board has inputs I (power and data) and outputs O (power), each on its own network. Arrows on the device point in or out. Power passes through a buffer: never more goes out than comes in. An output on an input network is a short circuit.

The wall boxes sit on a mounting frame 16 cm in front of the wall. They stay fully visible in a finished wall too, the cables lie on the wall as usual. Levers and display can be used while standing.

BoardInputsOutputsProtectionDisplay
Switch BoxI1 leftO1/O2 bottom, O3/O4 topswitches only, no tripping–
Small Distribution BoardI1 top leftO1/O2 bottom, O3/O4 topminiature circuit breakers6 pages
Sub-Distribution BoardI1 top, I2 bottom, both leftO1–O4 bottom, O5–O8 topminiature circuit breakers, metering per output12 pages
Main Distribution BoardI1/I2 left, I3/I4 right, at floor levelO1–O6 front, O7–O12 back, on top to the ceilingminiature circuit breakers, priorities 1–319 pages

The switch box is meant for lights, doors and small loads: four switches and a main switch, no metering. The cable protection only limits.

Miniature circuit breakers

The small, sub- and main boards have a toggle lever with an LED per output. It trips when the output network wants more than the limit for longer than 2 s: its own limit (LIMIT button on the output page, 1 kW to 10 MW in the 1–2–5 series) or the cable limit. Lever up again means reset and on. Clicking a lever jumps the display to that output's page.

Output LEDMeaning
greensupplied
yellow blinkingnot enough power
blueon, but no power
orangeat the limit
orange blinkingshed (load shedding)
red blinkingtripped or short circuit

Sub-distribution board: mains and reserve

The SELECT button on the overview page sets the mode:

ModeEffect
PARALLELboth inputs supply a share
PRIORITYI1 first, I2 only covers the rest. If I1 fails, I2 takes over without interruption
MANUAL I1I1 only
MANUAL I2I2 only

Main distribution board: priorities and load shedding

  • Every input has a rank: PRIORITY, RESERVE or OFF (SELECT button on the input page).
  • Every output has a priority 1 to 3 (SELECT button on the output page).
  • Load shedding (SELECT button on the overview): if the power is short for more than 2 s, first the outputs with priority 3 are disconnected, then those with priority 2. Priority 1 is never shed. With 5 % margin for 10 s the groups return.
  • When power is short, outputs are supplied in the order of their priority.
  • Groups: IC10 or uw gruppe switch all outputs of one priority at once.

The cabinet is 1.75 m high and fits under a 2 m ceiling. It has no connections at the back, so it can stand against a wall. The SHED LED shows that load shedding is active.

IC10

DevicePrefabHash
Small TransformerStructureUwTrafoKlein1038222347
Medium TransformerStructureUwTrafoMittel16731149
Large TransformerStructureUwTrafoGross-1771513230
Power TransformerStructureUwTrafoHoechst712399162
Generator TransformerStructureUwTrafoMaschine1160813939
Grid Coupling TransformerStructureUwTrafoKuppel-69342696
Grid StabiliserStructureUwStabilisator-1611475910
Incoming BayStructureUwEinspeisefeld1256556147
Outgoing BayStructureUwAbgangsfeld-1814949360
Control DeskStructureUwSchaltwarte-1010030166
Switch BoxStructureUwSchaltkasten-2107604856
Small Distribution BoardStructureUwKleinverteiler-819654580
Sub-Distribution BoardStructureUwUnterverteiler-1570398503
Main Distribution BoardStructureUwHauptverteiler491213690

State (all devices): 0 off, 1 ready, 2 running, 3 at the limit, 4 warning, 5 tripped, 6 conflict, 7 no cable, 8 earthed. Trip reason: 1 over-temperature, 2 short circuit, 3 manual, 4 overload, 5 earth fault. Writable addresses are marked (W). clr clears the manual limits.

Transformer

LogicTypeMeaning
Onmain switch
Mode0 OFF, 1 FORWARD, 2 REVERSE (read and write)
Settingmanual limit in W, 0 = none (read and write)
Maximumeffective limit in W
Ratioload, 1 = rated power
PowerActualflow in W, negative = reverse
PowerGeneration, PowerRequireddelivered and drawn power in W
Temperaturewinding temperature in K
Activateread: tripped; write 1 = trip, 0 = reset
Error1 = fault
AddressMeaning
0–3flow, drawn, delivered, loss in W
4temperature in °C
5load in %
6, 7rated power, effective limit in W
8, 9cable limit PRIMARY, SECONDARY in W, -1 = unlimited
10fan stage
11cooling preset: -1 AUTO, 0 to 2 (W)
12seconds to the warning temperature, -1 = never
13, 14state, trip reason
15mode (W)
16manual limit in W (W)
17display page (W)
18data bridge (W)
19, 20energy and losses in MWh
21ambient in °C
22buffer in J

Grid Stabiliser

LogicTypes: On, Mode (0 FOLLOW, 1 CONSTANT, 2 SMOOTH), Setting (set point in W), Charge (storage in J), Maximum (capacity in J), Ratio (level), PowerActual and PowerGeneration (output), PowerRequired (intake), Activate, Error.

AddressMeaning
0, 1output, intake in W
2, 3storage, capacity in J
4level in %
5set point in W
6input average in W
7, 8seconds to empty or full, -1 = not foreseeable
9maximum power in W
10mode (W)
11set point (W)
12smoothing time in s (W)
13, 14state, trip reason
15display page (W)
16data bridge (W)
17energy in MWh

Incoming and outgoing bay

LogicTypes: On (breaker, interlocked), Open (disconnector, 1 = open), Mode (protection mode: outgoing 0 LIMIT, 1 TRIP; incoming 0 PRIORITY, 1 RESERVE), Setting (limit in W), Maximum, Ratio, PowerActual (plus = busbar to line), Activate, Error.

AddressMeaning
0flow in W
1manual limit in W (W)
2, 3cable limit busbar, line in W
4effective limit in W
5, 6state, trip reason
7breaker (W)
8disconnector closed (W)
9earthing (W)
10protection mode (W)
11trip delay in s (W)
12, 13generation, demand in the line network in W
14number of trips
15display page (W)
16data bridge (W)
17energy in MWh

Control Desk

LogicTypes: Setting (selected bay), Quantity (number of bays), Mode (display page), Activate (1 = reset all), Error (horn).

AddressMeaning
0, 1number of bays, number of busbars
2selected busbar (W)
3selected bay (W)
4, 5total incoming, total outgoing in W
6tripped bays
7horn; writing 0 silences it
16 + bay × 4 + 0state of the bay
16 + bay × 4 + 1flow in W
16 + bay × 4 + 2position as bits: 1 breaker, 2 disconnector closed, 4 earthing, 8 tripped, 16 incoming
16 + bay × 4 + 3command (W): 1 ON, 2 OFF, 3 close disconnector, 4 open disconnector, 5 earthing on, 6 earthing off, 7 reset

The bays are numbered in the order of the network diagram, starting at 0.

Distribution boards

LogicTypes: On (main switch), Mode (sub-board: mode 0 PARALLEL, 1 PRIORITY, 2 MANUAL I1, 3 MANUAL I2; main board: load shedding 0/1), PowerActual (output), PowerGeneration (intake), PowerRequired (demand of the output networks), Quantity (outputs switched on), Ratio, Activate (1 = trip all, 0 = reset), Error.

AddressMeaning
0state
1, 2, 3intake, output, demand in W
4mode or load shedding (W)
5shedding stage
6display page (W)
7data bridge (W)
8energy in MWh
9, 10number of inputs, number of outputs
11–13outputs switched on with priority 1–3; writing switches the whole group on or off (W)
141 = shortage

From address 16 come 4 addresses per input: +0 state, +1 flow, +2 rank 0 PRIORITY, 1 RESERVE, 2 OFF (W), +3 cable limit. After that 8 addresses per output: +0 state, +1 flow, +2 ON (W), +3 limit in W (W), +4 priority (W), +5 cable limit, +6 demand in the network, +7 trip reason.

Boardfirst output from address
Switch Box, Small Distribution Board20
Sub-Distribution Board24
Main Distribution Board32

Example: switching on output 3 of the main board = put to 32 + 2 × 8 + 2 = 50.

Example: show the transformer temperature

The large transformer is named "Trafo", a small LED display "Trafo" as well. The display shows the winding temperature in °C and changes colour like the TEMP. LED on the transformer.

# Substation: transformer temperature in C, colour like the TEMP. LED
define TRAFO -1771513230  # Large Transformer
define ANZEIGE -815193061 # LED Display (Small)
define CELSIUS 273.15     # K minus C
define LUEFTER 60         # C, fan stage 1 from here
define WARNUNG 105        # C, the transformer throttles from here
define KRITISCH 125       # C, 5 K before the trip
define GRUEN 2            # Color.Green
define GELB 5             # Color.Yellow
define ORANGE 3           # Color.Orange
define ROT 4              # Color.Red
alias temp r0
alias farbe r1
alias test r2
start:
yield
lbn temp TRAFO HASH("Trafo") Temperature 0
bnan temp start
sub temp temp CELSIUS
move farbe GRUEN
sge test temp LUEFTER
select farbe test GELB farbe
sge test temp WARNUNG
select farbe test ORANGE farbe
sge test temp KRITISCH
select farbe test ROT farbe
sbn ANZEIGE HASH("Trafo") Setting temp
sbn ANZEIGE HASH("Trafo") Color farbe
j start

Example: switch off priority 3 when the battery is low

The main distribution board is named "Hauptverteiler", a large station battery "Akku". If the battery falls below 25 %, the chip switches off every output with priority 3, above 50 % it switches them on again. It writes once at start and after that only on a change, so outputs switched by hand stay as they are otherwise.

# Substation: main board, priority 3 by battery level
define VERTEILER 491213690 # Main Distribution Board
define AKKU -1388288459    # Station Battery (Large)
define GRUPPE3 13          # put: group priority 3 on/off
define UNTEN 0.25          # below 25 % group off
define OBEN 0.5            # above 50 % group on
alias vt r0
alias ladung r1
alias soll r2
alias alt r3
alias test r4
lbn vt VERTEILER HASH("Hauptverteiler") ReferenceId 0
move soll 1
move alt -1
start:
yield
lbn ladung AKKU HASH("Akku") Ratio 0
bnan ladung start
slt test ladung UNTEN
select soll test 0 soll
sgt test ladung OBEN
select soll test 1 soll
beq soll alt start
put vt GRUPPE3 soll
move alt soll
j start

The second example needs exactly one main board named "Hauptverteiler" in the network.

Console commands

Console with F3. The commands act on the nearest device. uw status, uw info and uw bays work everywhere, switching only on the host or server or in single player.

CommandEffect
uw statusall devices and control desks
uw infonearest device in detail
uw baysbusbars with their bays
uw ack / uw ack allreset the trip of the nearest device or of all devices
uw on / uw offmain switch or breaker
uw disconnector open / closeddisconnector of the nearest bay
uw earth on / offearthing switch of the nearest bay
uw limit 2.5MWmanual limit in W, kW, MW or GW, 0 = none
uw mode forwardtransformer: forward, reverse, off; stabiliser: follow, constant, smooth
uw setpoint 100kWstabiliser set point for CONSTANT, 0 = maximum power
uw cooling autofans: auto, 0, 1 or 2
uw protection tripoutgoing bay: limit or trip; incoming bay: priority or reserve
uw bridge ondata bridge on or off
uw temp 100test: set the winding temperature of the nearest transformer
uw estopevery breaker of the nearest control desk OFF
uw output 3 offdistribution board: output on, off, limit <W> or prio <1-3>
uw input 2 reservedistribution board: input priority, reserve or off
uw operation prioritysub-board: parallel, priority, manual1, manual2
uw shedding onmain board: load shedding on or off
uw group 3 offall outputs of one priority on or off
uw hilfelist of commands

The German words work too: felder, quitt, ein, aus, trenner, erder, grenze, modus, soll, kuehlung, schutz, bruecke, notaus, abgang, eingang, betrieb, lastabwurf, gruppe, vorwaerts, rueckwaerts, folgen, konstant, glaetten, begrenzen, ausloesen, vorrang, an.

Configuration

File: BepInEx\config\dominik1199.umspannwerk.cfg, or via the mod settings in LaunchPad. The server's values apply. Changes take effect at once, except SchieneGrenzeMW and HoerweiteM (after a restart).

KeyDefaultMeaning
KabelReserveProzent95at most this percent of the weakest cable or fuse flows through a connection, 50 to 100
UeberschussProzent95this percent of the surplus is taken from a network with its own consumers, 50 to 100
NennKleinKW10rated power of the small transformer in kW, 1 to 10,000
NennMittelKW100rated power of the medium transformer in kW, 10 to 100,000
NennGrossKW500rated power of the large transformer in kW, 50 to 1,000,000
NennHoechstMW10rated power of the power transformer in MW, 1 to 10,000
NennMaschineMW100rated power of the generator transformer in MW, 1 to 10,000
NennKuppelMW1000rated power of the grid coupling transformer in MW, 10 to 10,000
VerlusteAktivonoff = lossless, no heating
VerlustLeerlaufPromille1no-load loss in per mille of the rated power
VerlustLastProzent0.8load loss at rated power in %, grows with the square of the load
TemperaturAktivonoff = transformers always stay cold
UeberlastProzent150highest load in % of the rated power, 100 to 300
UeberlastDrosselnonthrottle from the warning temperature instead of tripping
WarnTempC105warning temperature in °C, throttling starts
AbschaltTempC130trip temperature in °C
WiedereinschaltTempC90an over-temperature trip can only be reset below this
ThermischeZeitFaktor1factor on the heating time, 0.1 to 10
UmgebungMaxC50highest ambient temperature the cooling works with
KuehlungLuftdruckoncooling depends on air pressure, in vacuum radiation only
WaermeInLuftProzent100this % of the waste heat goes into the air at the device
WaermeInLuftMaxKW10at most this much waste heat in kW goes from one transformer into the air
StabiLeistungKW250maximum power of the stabiliser in kW, up to 10,000,000
StabiKapazitaetMJ10storage of the stabiliser in MJ, up to 1,000,000
StabiVerlustProzent1converter loss in % of the output
StabiGlaettungS120smoothing time for SMOOTH in s, 10 to 3600
SchieneGrenzeMW0capacity of the busbar in MW, 0 = unlimited
Verriegelungoninterlocking of the bays; off = everything can be switched, ON onto an earthed bay trips "earth fault"
AusloeseVerzoegerungS2TRIP mode and circuit breakers: seconds of overload until the trip
AutoWiedereinschaltungoffa bay switches back on once by itself after an overload trip
AweSekunden10pause before reclosing in s
Datenbrueckeonallow the data bridge at all
DatenbrueckeStandardondata bridge switched on for newly built devices
HoerweiteM20hearing distance of the hum in m, scaled by transformer size
AlarmTononcontrol desk and devices signal trips with a beep
AbwurfVerzoegerungS2main board: seconds of shortage until the next group is shed
WiederzuschaltungS10main board: seconds with enough power until a group returns

Multiplayer

New devices: the server and all players need the mod. The server calculates; displays, LEDs, switch positions and the network diagram are synchronised to everyone and saved with the game. See Multiplayer.

Known limitations

  • A single game cable or fuse in the network limits the whole connection. GW power is only possible if the network consists entirely of unlimited conductors.
  • A transformer with MW losses puts at most 10 kW of heat into the air, the rest counts as radiated. Otherwise a single air cell would overheat at once.
  • In vacuum the fans do nothing, so a heavily loaded transformer runs throttled there.
  • Several stabilisers on the same networks work against each other. For large grids rather set one stabiliser to a higher power in the config.
  • There is no timer. Outputs and groups can be switched by IC10 with a clock or a daylight sensor.
  • The data bridge links devices, not the channels Channel0–7.

Troubleshooting

SymptomCauseFix
Cable limit orange on the displaya cable in the network carries less than the rated powerlay busbar, Power Cable+ or Fluix Line Unlimited all the way
Transformer only delivers 9.5 MWExtreme Cable in the networkunlimited conductors for more power
THROTTLEDtransformer above 105 °Creduce the load, check the fans, cooler surroundings
TRIPPED: over-temperature, ACK does nothingtransformer still above 90 °Clet it cool down, then ACK
TRIPPED: short circuitboth sides on the same networkseparate the networks: every connection needs a network of its own
EARTHED, bay does not switch onearthing ONearthing OFF, then disconnector CLOSED, then ON
Disconnector cannot be switchedbreaker ON (interlocking)breaker OFF first
Control desk: NO BAYSbays not in the desk's data networkconnect the desk to the busbar or to a network with a data bridge
Whole switchgear only delivers 4.75 kWthin cable in the busbar network, e.g. to the control deskconnect the desk through a network of its own with a data bridge
Output LED orange blinkingload shedding in the main boardmore generation; the group returns after 10 s with 5 % margin
Output LED red blinkingcircuit breaker tripped or output on the input networkreduce the load or separate the networks, lever up again
IC10 cannot find a device behind the transformerdata bridge offDATA button or uw bridge an
Nothing flowsmain switch off, mode OFF or bay not closedcheck switch, MODE and bay position